I have an old Unraid 6 server (built sometime in 2010) that is failing. Rather than spend anymore time diagnosing the server, I'm just going to cannibalize the case and power supply, and build something new.
I'd like to move the disks from the old server into the new machine. What is the best procedure for moving drives with existing data on them to a new build. The new build will have a 4TB parity so that I can add larger drives in the future. Do I just move all the drives over to the new