ebnerjoh Posted November 2, 2017 Share Posted November 2, 2017 Hi, I am not sure if there is already a thread available but I didnt found either an FAQ, Docu or Thread for that topic. I have troubles with my running Unraid Installation on a HPE ML10 Gen9 (1 Parity, 1 Data, 1 Cache Drive). Maybe I have a hardware fault. I have a spare HP MicroServer N40L. Can I easily move the UnRaid Installation to the backup Server? Just shutdown the productive Server, remount Drives and booting up the backup server? Br, Johannes Quote Link to comment
JorgeB Posted November 2, 2017 Share Posted November 2, 2017 It's usually as simple as that. Quote Link to comment
SpaceInvaderOne Posted November 2, 2017 Share Posted November 2, 2017 Yes as Johnnie says its as simple as that. Shutdown the server, put hard drives in the other server and put in the same USB drive and boot up and it will work Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.