ByndDiablical_WA

Members
  • Posts

    1
  • Joined

  • Last visited

Everything posted by ByndDiablical_WA

  1. Unraid - Homelab, NAS and Media Server - 1st Build (Not 100% complete(configuration)) Dell Poweredge R510 8bay - 2x Xeon E5645 6c/12t w/ 80Gb ECC RAM 2x onboard NIC's + NetXtreme II BCM5716 Gigabit Ethernet 4 port PCIe card. PERC H200 - LSI HBA SAS2008 - Flashed in IT mode. 3TB Sata Parity - 3 + 2 TB sata, 600 + 400 x 3 Gb SAS drives. Cache pool - 500Gb sata M.2 + 250 Gb NVMe PCIe *****require heat syncs - hitting 70 degrees at times. 2x 750w hot-plug PSU Power Consumption - monitored with efergy inline meter. - Prior to power up - ~21.3w being consumed by 8 port switch, wireless repeater and server standby. - 1st boot(warm) ~209w - Mem check and bios phase ~190w - System services starting(iDrac, SAS controller, Network interface etc.) ~210w - UNRAID Boot and hard drive start phase ~270w and peak at 311.3w. - Settled at ~220w. Yet to complete configuration, will edit post once I finalize happy config.
  2. Unraid Server - Homelab,NAS and Media Server
    Dell Poweredge R510 8bay model - 2x Xeon E5645 6c/12t w/ 80Gb ECC RAM
    2x onboard NIC's + NetXtreme II BCM5716 Gigabit Ethernet 4 port
    LSI SAS2008 - Flashed in IT mode
    3TB Sata Parity - 3 + 2 TB sata, 600 + 400 x 3 Gb SAS
    Cache pool - 500Gb sata M.2 + 250 Gb NVMe PCIe

     

    Power Consumption - monitored with efergy inline meter.
    - Prior to power up - ~21.3w being consumed by 8 port switch and wireless repeater.

    - 1st boot ~209w
    - Mem check and bios phase ~190w
    - System services starting(iDrac, SAS controller, Network interface etc.) ~210w
    - UNRAID Boot and hard drive start phase ~270w and peak at 311.3w.
    - Settled at ~220w.

     

    Yet to complete configuration, will edit post once I finalize happy config.

     

    5 - QZGzHaK.jpg

    1 - 3ANIa1k.jpg

    2 - eddiWUd.jpg

    3 - 3SxG7lQ.jpg

    4 - KuhMpHg.jpg

    Unraid Server Build - Imgur.jpg