Is it currently possible, or can it in the future be possible to update per container after backup? I looked through the settings and didn't see an option for the sequence.
From what I understand when looking at the logs a container is:
Stopped
Backed up
Backup is verified
Started
This is done for all containers on the list then the updates start. Thus each container is stopped twice, once for backup then once for update if applicable. I would like to have the containers:
Stop
Backup
Verify Backup
Update if applicable
Start