This is cracking stuff, Guy.
I'm struggling a little with the logic for the plotting scheduling parameters, and looking for some advice. If I always want plotman to wait before starting another plot on a temp drive that already has a phase 1 plot, will this do the job?
# Plotting scheduling parameters
scheduling:
# Run a job on a particular temp dir only if the number of existing jobs
# before tmpdir_stagger_phase_major tmpdir_stagger_phase_minor
# is less than tmpdir_stagger_phase_limit.
# Phase major corresponds to the plot phase, phase minor corresponds to
# the table or table pair in sequence, phase limit corresponds to
# the number of plots allowed before [phase major, phase minor]
tmpdir_stagger_phase_major: 2
tmpdir_stagger_phase_minor: 1
# Optional: default is 1
tmpdir_stagger_phase_limit: 1
Any help great appreciated.